AK-TT01 — UNDERGROUND ANCHORS, SUSPENDED LOADS & RIGGING SIGNALS TALK
Five-control original underground anchor, suspended-load and rigging signal toolbox. It links mine engineering acceptance, winder interface duties, current gear certificates and independently assessed roof or sidewall suspension points.
WHERE TO USE THIS ORIGINAL MINE RECORD
Use before lifting near mine ground support, personnel, plant, services or shafts. Capture Mine / area, Contractor, Date / shift, Presenter, Work order / task and Risk assessment ref.
FIVE ORIGINAL SPECIALIST LIFTING TOOLBOX CONTROLS
1. Mine lifting/engineering owner accepts lift class, loads, access route and operating envelope.
2. Shaft/winder/material handling company and mine responsible persons identified where relevant.
3. Rigging equipment inspection/test certificates and operator competence current.
4. Underground roof/sidewall anchors and suspension points assessed by authorised mine engineers.
5. Stop if any suspended load may contact unsupported ground, mine services, personnel or emergency egress.
HOW TO COMPLETE THE ACTUAL PRINTED SOURCE
Use the five genuine printed controls, document the mine lift class, route, competent signal staff, certified gear and authorised mine engineers' anchor assessment. Record the actual source attendance table.
CRITICAL STOP-WORK AND MINE AUTHORITY
Stop for an unrated underground anchor, poor headroom, signal loss, unapproved shaft access or a load near unsupported ground or refuge. Obtain formal mine permission.
TECHNICAL EVIDENCE, TEST RESULTS AND CREW ACCOUNTABILITY
Retain the actual mine lifting class and work-order permission, engineer-accepted suspension capacity, current certificates, communication and exclusion proof. Confirm actual machine or shaft access restrictions and competent witness signatures before use; never assume the contractor can issue mine lifting authorisation.
BUY A SINGLE WORD FILE OR THE COMPLETE MINE COLLECTION
This R12.95 authentic editable AK-TT01 Word record is already included in the 371-original Underground Mining Checklist Package and the complete 628-page Contractor H&S File. Owners of either containing collection should avoid duplicate purchases. Mine-appointed lifting, shaft transport and engineering authority always governs the work.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles