187 - AK-T01 | Rigging & Shaft Transport Work Inspection Test Record
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95
AK-T01 — RIGGING & SHAFT TRANSPORT WORK INSPECTION TEST RECORD
The source-original seven-row underground lifting, rigging and shaft-transport inspection/test Word form traces accepted load mass and centre of gravity through certificates, shaft conveyance declaration, ground anchor engineering, trial lifts, set-down and mine logistics handback.
WHERE AND WHEN TO COMPLETE THIS TECHNICAL RECORD
Use after a permitted underground lift or shaft transport task to record real test results and responsible mine acceptance. Identify Underground mine / site, Contractor, Item / system / asset ID, Work order, Drawing / revision and Activity date, using the current mine-approved load plan and lift classification.
SEVEN ACTUAL SOURCE-ORIGINAL LIFTING TEST ITEMS
1. Load mass, centre of gravity and lift plan
2. Rigging certificate and mine lifting-authority register
3. Shaft/material conveyance load declaration
4. Suspension anchor/ground/roof engineering release
5. Lift exclusion, communications and trial-lift record
6. Load set-down, residual support and route check
7. Mine lifting and logistics owner handback
HOW TO COMPLETE ACTUAL MEASUREMENTS AND EVIDENCE
Enter the source's TEST / COMPLETION RECORD, RESULT / MEASUREMENT and SOURCE / SIGN-OFF for all seven test rows. Attach weighed/declaration values, up-to-date rigging certificates, mine lifting authority proof, approved roof/sidewall anchor, communications and exclusion tests, load set-down support and receiving-mine signatures.
MINE LIFTING PERMISSIONS AND STOP RULES
Blank test fields are not evidence; the original requires real testing and sign-off. Record incomplete, defective or restricted equipment. An unrated anchor, unsupported ground, loss of signal, unsafe winder access or compromised emergency egress demands STOP and mine control notification. The authorised mine lifting owner grants handback.
EVIDENCE AND SHOPPING INFORMATION
This original editable Word document captures actual mine inspection and certification evidence, rather than conferring statutory lifting permission. The R12.95 AK-T01 Single is already included in the 371-original Underground Mining Checklist Package and the complete 628-page Contractor H&S File. Existing owners should avoid a duplicate purchase.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

