186 - AK-R04 | Rigging Defects, Materials & Reinstatement Register
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95
AK-R04 — RIGGING DEFECTS, MATERIALS & REINSTATEMENT REGISTER
Seven-item underground rigging and shaft conveyance materials/reinstatement evidence record. It begins with completed lifting attachments and ends with independent approval of the underground anchor/hanging point. It documents only actual measured results, approved materials and witnessed close-out.
WHEN TO USE THIS MINE ORIGINAL
Use after authorised mine lifting, repairs to suspension equipment, rigging changes or shaft conveyance work. Enter MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. Retain current load declarations and lift/anchor engineering.
SEVEN SOURCE-ORIGINAL RIGGING EVIDENCE ITEMS
1. Lift completed and temporary lifting attachments removed or handed over
2. Emergency retrieval of suspended load agreed with mine responsible officer
3. Crane, chain block, hoist and rigging certificates in date
4. Headroom and ground support clearance validated along entire load path
5. Rigger/signaller competence, radio calls and exclusion zones approved
6. Shaft conveyance dimensions, weight and lifting point declarations accepted
7. Underground anchor or hanging point is independently approved for load
HOW TO COMPLETE ACTUAL SOURCE WORD RECORDS
The seven source MINING-SPECIFIC ITEM / EVIDENCE TO TRACK rows require DOCUMENT / RESULT / MEASURED VALUE and DATE / AUTHORITY / STATUS. Refer to certificates, measured headroom, mine rigging release, competent signallers and closed temporary lift attachments.
CRITICAL MINE LIFTING AND STOP-WORK RULES
Do not release equipment where a suspension anchor, shaft transport clearance, rescue retrieval or rigging certificate remains unverified. Record NCR, outstanding defects, reinspection and responsible mine acceptance before handover.
EVIDENCE, RESPONSIBILITY AND SAFE WORK AUTHORITY
Maintain actual load declarations, authorised lifting plan and working envelope, engineer-approved roof anchors, current equipment tests, signaller/exclusion arrangements and mine access clearances. Neither this record nor a contractor signature changes statutory mine-owner control over suspended loads or shaft movement.
BUY ONE WORD SINGLE OR THE COMPLETE UNDERGROUND FILES
This R12.95 AK-R04 original editable Word file is also included in the 371-original Underground Mining Checklist Package and the 628-page Contractor H&S File. Buyers who already own either complete collection should not buy it again. Always apply the actual mine lifting permits and host engineering releases.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

