182 - AM-00 | Rigging Cranes Hoists Trade Scope Activation
Buy 4 Checklists, Get 1 Free
POWER PLANT LIFTING SAFETY PURPOSE
Source-original AVC AM-00 editable Word for power plant contractors engaged in Rigging, Cranes, Hoists and Critical Lifting near operating turbines, generators and maintenance outage workfaces. This specific source addresses eight original scope activation requirements, operator permits and competent rigging/lifting authority. Cranes and suspended loads cannot be operated on assumed ground capacity, unknown loads or unverified personnel authorisation.
WHEN TO COMPLETE THE ORIGINAL
Complete against the real CONTRACT / UNIT, WORK PACKAGE / ASSET, DATE / SHIFT and PERMIT / REVISION or SITE / UNIT and work-zone fields. Confirm certified crane radius/load chart and lifting tackle, engineered ground/outrigger load, verified mass/centre of gravity, rated lifting points, exclusion zone, competent lift director and signaller, weather stop limit and station operator permit before lifting.
REAL PRINTED WORD CRITERIA
The genuine Word contains 8 numbered technical STOP, HOLD, inspection or activation controls: 1. Work order/plant tag and approved scope match the intended trade task; 2. Applicable OHS, Construction Regulations and operator rules screened for this activity; 3. Trade-qualified personnel, inductions, medicals and authorisations in place; 4. Current risk assessment and accepted method statement briefed to the crew; 5. Permits, isolations, SIMOPS and safe work-area release agreed with operator; 6. Inspection and test plan, hold/witness points and documents identified.
LIFT CERTIFICATES, WITNESS OR CREW EVIDENCE
Use the original YES/NO/N/A or OK/HOLD/N/A fields for documented results, work-zone deviations, actual lift authorisations, clearance and technical handover evidence. A blank check is not acceptance.
SEPARATE STATION AND LIFT AUTHORITY
The appointed lifting machinery inspector/competent supervisor and station owner each retain their own authority. Neither an AVC checklist nor a signed crew briefing permits critical lifts, crane movements across live plant, changes to approved rigging, hazardous proximity or facility return to service. Stop the lift for lost communications, wind threshold or abnormal load movement.
SOURCE ORIGINAL WORD AND AVC FILES
This authentic editable source-original AVC Word Single is R12.95. The same form is already included in the complete 277-document Power Generation & Industrial Outage Checklist Package and 525-page Contractor H&S File; avoid buying identical sources twice. Eligible Singles may qualify for BUY 4 GET 1 FREE while the automatic checkout offer applies (five pay for four, ten for eight and fifteen for twelve). Confirm checkout; packages excluded.

