182 - AK-H02 | Rigging Witness Hold & Mine Return-to-Service Gate
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95
AK-H02 — RIGGING WITNESS HOLD & MINE RETURN-TO-SERVICE GATE
Five-gate independent mine witness hold and return-to-service record for rigging, lifting, suspended loads and shaft transport. The original begins with load mass and centre-of-gravity verification and ends with acceptable headroom/ground clearance.
WHEN TO USE THIS MINE ORIGINAL
Use before lifting stages or final mine-owned acceptance of a suspended load and affected working. Enter MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR, naming receiving mine lifting and transport authorities.
FIVE GENUINE MINE WITNESS HOLD GATES
1. Mine lifting classification, load mass and centre of gravity verified
2. Underground anchor or hanging point is independently approved for load
3. Shaft conveyance dimensions, weight and lifting point declarations accepted
4. Rigger/signaller competence, radio calls and exclusion zones approved
5. Headroom and ground support clearance validated along entire load path
HOW TO COMPLETE ACTUAL SOURCE WORD RECORDS
Complete the five genuine HOLD TRIGGER / EVIDENCE GATE, REQUIRED EVIDENCE / VERIFICATION and RESULT / REFERENCE / WITNESS columns. Verify class and weight, approved hanging anchor, conveyance dimensions, competent signals/exclusions and clear load travel under ground support.
CRITICAL MINE LIFTING AND STOP-WORK RULES
Every applicable hold must PASS, defects corrected and witnessed, and the evidence tied to the mine work order. Only an appointed mine official may issue the area or plant release; a contractor's signature does not.
EVIDENCE, RESPONSIBILITY AND SAFE WORK AUTHORITY
Maintain actual load declarations, authorised lifting plan and working envelope, engineer-approved roof anchors, current equipment tests, signaller/exclusion arrangements and mine access clearances. Neither this record nor a contractor signature changes statutory mine-owner control over suspended loads or shaft movement.
BUY ONE WORD SINGLE OR THE COMPLETE UNDERGROUND FILES
This R12.95 AK-H02 original editable Word file is also included in the 371-original Underground Mining Checklist Package and the 628-page Contractor H&S File. Buyers who already own either complete collection should not buy it again. Always apply the actual mine lifting permits and host engineering releases.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

