top of page

181 - AK-F01 | Rigging Hold, Release & Mine Handover Record

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE-IDENTICAL EDITABLE WORD | R12.95

AK-F01 — RIGGING HOLD, RELEASE & MINE HANDOVER RECORD

The five-stage source-original underground lifting, rigging and shaft transport hold/release record controls mine lift permits, approved gear and suspension anchors, exclusion and radio signals, witnessed proving movements and final mine load handback.

WHERE THIS ORIGINAL APPLIES

Use at critical transitions in a mine-authorised lifting task, not as a lift plan. Record Underground mine / site, Company, Area / equipment, Permit / work order, Supervisor and Host-mine work owner.

FIVE ACTUAL MINE HOLD/STOP STAGES

1. Mine lifting/shaft interface plan and task permit

2. Suspension/anchor and lifting gear acceptance

3. Exclusion, safe signals and transport route release

4. Critical lift/proving move witness acceptance

5. Mine lifting/shaft official load handback

HOW TO COMPLETE THE ORIGINAL WORD RECORD

For the real five STEP / HOLD / STOP POINT items, mark Hold, Release or N/A; record VERIFIER / RECORD, evidence, time and signature. Obtain separate host-mine acceptance before moving to each next phase.

MINE AUTHORITY, LOAD SAFETY AND STOP CONDITIONS

The original NO RELEASE IF rule prohibits progress without a required technical witnessed hold, permit or mine permission. Contractor and HOST-MINE RELEASE signatures are separate.

EVIDENCE AND AUTHORITY CONTROL

Record mine-issued load declarations, actual rigging certificates, rock-anchor engineering where required, competent signallers, safe load travel paths and receiving-mine signatures. Keep supporting documents with the original source form. Contractors cannot give themselves shaft, winder, suspended-load or mine production authority through a checklist.

BUY ONE ORIGINAL OR THE COMPLETE UNDERGROUND COLLECTION

The R12.95 editable AK-F01 Word source is included in the 371-document Underground Mining Checklist Package and full 628-page Contractor H&S File. Owners of either complete collection should not buy the Single twice. Follow current mine engineering, shaft operator, lifting permits and formal acceptance.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

628-page Underground Mining Contractor H&S File

    bottom of page