top of page

180 - AK-C03 | Rigging Critical Task & Emergency Readiness Checklist

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95

AK-C03 — RIGGING CRITICAL TASK & EMERGENCY READINESS CHECKLIST

The actual seven-point critical task and emergency readiness mine rigging checklist starts with competent underground anchor approval and finishes with safe handover or removal of temporary lift attachments. It is for mine-authorised lifting, load movement and shaft conveyance interfaces.

WHERE THIS SOURCE MINE LIFTING RECORD APPLIES

Use at the actual mine hoist, suspended-load or rigging workface and before a changed task or shift. Fill MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR and cite current mine lifting rules.

SEVEN REAL MINE RIGGING CRITICAL SAFETY CONTROLS

1. Underground anchor or hanging point is independently approved for load

2. Shaft conveyance dimensions, weight and lifting point declarations accepted

3. Rigger/signaller competence, radio calls and exclusion zones approved

4. Headroom and ground support clearance validated along entire load path

5. Crane, chain block, hoist and rigging certificates in date

6. Emergency retrieval of suspended load agreed with mine responsible officer

7. Lift completed and temporary lifting attachments removed or handed over

HOW TO COMPLETE THE PRINTED ORIGINAL WORD

Mark each of the seven genuine WORKFACE VERIFICATION / REQUIRED CONTROL items Y, N or N/A with EVIDENCE / DEFECT / ACTION. Attach approved suspension-load capacity, shaft conveyance dimensions, signaller credentials, headroom and ground clearance, gear certificates and emergency retrieval acceptance.

MINE STOP-WORK AND OPERATOR RELEASE RULE

HOLD if mine permission, independent anchor engineering, safe signals, headroom, emergency recovery or actual equipment test evidence is absent. A contractor checklist does not authorise the suspended load or mine shaft.

PROOF, SAFETY RESPONSIBILITY AND STORE OPTIONS

This R12.95 editable original AK-C03 Word Single is also included in the 371-document Underground Mining Checklist Package and full 628-page Contractor H&S File. Existing owners of either containing collection should avoid duplicate purchases. All source fields record evidence; mine lifting and statutory permissions remain with authorised mine officials.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining Contractor H&S File

    bottom of page