top of page

18 - AB-15 | Confined Space Heights Lifting and Dropped Objects

R 12,95Price

Buy 4 Checklists, Get 1 Free

PURPOSE OF THE SOURCE ORIGINAL

AVC AB-15 source-original editable Word eight-control checklist for confined space heights lifting and dropped objects. Designed for power plant and generating station contractors operating during planned or forced outages, the printed source captures evidence rather than granting a station work permit. Incorrect unit identity, undocumented isolation, poor emergency arrangements or unaccepted technical defects can create serious live-equipment hazards.

WHEN AND WHERE TO COMPLETE

Use the true SITE / UNIT, CONTRACTOR, WORK ORDER / REV and WORK AREA / ZONE fields. Verify original equipment tags, real current site work package and programme, nominated permit issuer, station operations contact, competence and appropriate engineering witnesses. Check this unit's adjacent live services and revise the record when the work or plant state changes.

ACTUAL PRINTED WORD CRITERIA

Eight original checks: confined atmosphere/entry/rescue, height and scaffold access, load-bearing lift points and signal crew, overhead isolation from live plant, emergency retrieval, competence and inspection, changed-condition STOP, closeout.

EVIDENCE AND ACTUAL ACCEPTANCE

For each of the eight original source controls enter YES, NO or justified N/A. Preserve the corresponding approved risk assessment, station specification, permit, inspection/test certificates, measurement and technical witness evidence. A tick or signature does not substitute for an operating approval.

HAZARDS, DEFECTS AND TECHNICAL ACCOUNTABILITY

Record the actual isolation or test plan, exposure controls, competent person, accepted evidence and open defect owner. Escalate electricity, steam pressure, fire impairment, hazardous atmospheres, environmental releases, lost workforce competency and unsafe SIMOPS. Link incident investigations and technical NCRs to their own controlled records; do not conceal unaccepted work or invent compliance.

SEPARATE STATION OPERATING AUTHORITY

The facility's electrical switching officer, plant controller, permit issuer and relevant technical owner independently control hazardous entry, isolation removal, energisation, critical tests and return to service. An AVC contractor form is not a station permission. Mark unverified conditions HOLD or stop work until an appointed authority issues the necessary real release.

SOURCE WORD AND AVC COMPLETE PACKAGES

This editable original AVC Word Single costs R12.95 and is also contained in the full 277-document Power Generation & Industrial Outage Checklist Package and 525-page Contractor H&S File. Avoid duplicate purchases. Eligible Singles may qualify for BUY 4 GET 1 FREE while the cart offer applies (5 pay for 4, 10 for 8, 15 for 12). Verify checkout; full packages excluded.

Browse AVC Checklist Singles

277-document Power Plants Checklist Package

525-page Power Generation H&S File

    bottom of page