top of page

18 - AB-14-C01 | Underground Shift Prestart, Task Risk & SIMOPS

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — EDITABLE SOURCE-ORIGINAL WORD | R12.95

AB-14-C01 — UNDERGROUND SHIFT PRESTART, TASK RISK & SIMOPS

This authentic AB-14-C01 Underground Mining Word form contains 10 printed mine safety release and workface verification points. Each buyer gets the real editable source document, not a generic substitute; every source point is identified below.

APPLICATION TO THE ACTUAL MINE WORK ORDER

Use this Underground Shift Prestart, Task Risk & SIMOPS for the relevant underground mine work zone, company, work order, assigned supervisor, shift and permitted task. Complete the source's location/asset and responsibility fields and confirm site-specific mine COP/SOP revisions.

TEN ORIGINAL SOURCE SAFETY VERIFICATION POINTS

1. Work order/area, mine official and shift status verified on each shift.

2. Personnel register and self-rescuer/medical/induction clearance checked.

3. Ground support, gas/ventilation and mine warning status current.

4. Mine production, blasting, vehicle, belt/rail and other contract work conflicts reviewed.

5. Shift task RA signed and safe work instructions understood by all.

6. Tools, plant, radio, refuge and rescue readiness checked.

7. Applicable permits and lockout owners current throughout shift.

8. Open defects and hold points from prior shift transferred in written handover.

9. Stop-work points and contingency discussed in briefing.

10. Area secured, tags/permits closed and all personnel accounted for at end of shift.

HOW TO COMPLETE THE ORIGINAL WORD

Mark the ten actual RELEASE / VERIFICATION POINT lines YES, NO or N/A with EVIDENCE / ACTION; explain defects, capture actual source documents, technical results and named mine review.

CRITICAL MINE STOP WORK AND OPERATOR AUTHORITY

Any NO against a critical risk, missing mine permit, unresolved hazard or failed emergency protection requires stop, escalation, correction and new mine-owned release. Contractor sign-off never overrides a host mine statutory controller's responsibility for incident response or plant restart.

INDIVIDUAL SOURCE WORD OR COMPLETE MINE COLLECTION

This R12.95 AB-14-C01 original is included in the complete 371-document Underground Mining Checklist Package and 628-page Contractor Health and Safety File. Owners of either should avoid duplicate purchase. Actual mine access and technical acceptance remain required.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining H&S File

    bottom of page