top of page

178 - AK-C01 | Rigging & Shaft Interface Ten-Point Prestart Checklist

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95

AK-C01 — RIGGING & SHAFT INTERFACE TEN-POINT PRESTART CHECKLIST

The genuine TEN-point mine lifting, rigging and shaft interface prestart covers owner-approved load classification, certified lifting gear, engineer-approved anchors, mine shaft declarations, traffic exclusion, tandem lift planning and official load landing/handover.

WHERE THIS SOURCE MINE LIFTING RECORD APPLIES

Use before approved mine lifting or shaft conveyance work. Identify Underground mine / site, Contractor / company, Area / zone, Date / shift, Work order / activity and Supervisor, using actual mine lift and access permissions.

TEN REAL ORIGINAL MINE RIGGING PRESTART CONTROLS

1. Mine lifting/engineering owner accepts lift class, loads, access route and operating envelope.

2. Shaft/winder/material handling company and mine responsible persons identified where relevant.

3. Rigging equipment inspection/test certificates and operator competence current.

4. Underground roof/sidewall anchors and suspension points assessed by authorised mine engineers.

5. Transport carriage dimensions, load security and shift communication agreed.

6. Workers kept out of blind corners, nip points and suspended load risk envelope.

7. Floor/road gradient, limited headroom and underground vehicle interaction controlled.

8. Special lifts, tandem lifts and recovery loads require task-specific approved engineering plan.

9. Communication signals, radios and emergency safe-lowering plans tested.

10. Load landing, anchor removal, route re-opening and shaft handoff signed by mine authority.

HOW TO COMPLETE THE PRINTED ORIGINAL WORD

For all ten RELEASE / VERIFICATION POINT rows mark YES, NO or N/A and EVIDENCE / ACTION. Obtain actual mass, centre-of-gravity, current test certificates, engineered suspended-load support, transport clearance, signal tests and official mine handback.

MINE STOP-WORK AND OPERATOR RELEASE RULE

All applicable operator-owned high-risk holds must be released before lifting. Contractor prestart and mine/host release are separate; this record cannot authorise mine winder operations.

PROOF, SAFETY RESPONSIBILITY AND STORE OPTIONS

This R12.95 editable original AK-C01 Word Single is also included in the 371-document Underground Mining Checklist Package and full 628-page Contractor H&S File. Existing owners of either containing collection should avoid duplicate purchases. All source fields record evidence; mine lifting and statutory permissions remain with authorised mine officials.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining Contractor H&S File

    bottom of page