AK-C01 is the original TEN-POINT editable Word MINE FIRE PROTECTION PRE-START and task readiness checklist. It covers the complete authorisation process from impairment of critical escape systems to owner-controlled restoration, rather than only inspecting an extinguisher or detector.

TEN MINE FIRE-SYSTEM PRE-START DECISIONS

A small repair can disable mine-wide fire-water, alarm or smoke protection. A suppression test can unexpectedly discharge an agent near personnel, and welding during impairment may leave the mine without normal protection. The source makes approved duration, compensating fire watch, test isolation and return to service separate controls.

ALL TEN ACTUAL SOURCE CONTROL POINTS

1. Identify critical fire, emergency and escape functions at risk. 2. Host approves fire-system isolation/bypass and duration. 3. Specify temporary fire watch, safeguards and notification. 4. Isolate electrical, hydraulic, water and gas energy. 5. Verify compatible devices and approved cause/effect revision.

6. Maintain fire water, hydrants and pumps. 7. Coordinate hot-work permits and impairment notices. 8. Protect occupied areas during suppression/detector tests. 9. Verify control-room alarms, interlocks and communications. 10. Confirm complete reinstatement before operational release.

EDITABLE WORD EVIDENCE AND MINE FIRE RELEASE

TEN original RELEASE / VERIFICATION POINTS with YES, NO, N/A and EVIDENCE / ACTION. Includes Mine/site, Area/zone, Work order/activity, Contractor/company, Date/shift and Supervisor. Unlike seven-item reassessments, the prestart also requires energy isolation, hot work coordination and control-room notifications. RECORD true pressure, flow and alarm test references; do not assume results.

RELEASE RULE: all applicable operator-owned/high-risk hold points must be released before start. CONTRACTOR CHECK, MINE / HOST RELEASE and DATE / REFERENCE are separate. N/A needs reason and evidence, STOP for failed critical fire coverage or missing mine approval.

THIS SINGLE OR COMPLETE SURFACE MINING FILE?

This identical source-original editable purchaser-licensed Word DOCX is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and complete Surface Mining Contractor H&S File. Buyers of either full collection receive this same record along with additional fire protection controls and site management forms, without a separate Single purchase. Current host mine fire system approvals are always required.

386-document Surface Mining Checklist Package

Complete Surface Mining Contractor H&S File

    bottom of page