top of page

177 - AK-00 | Rigging Annexure Scope Activation & Evidence Index

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE-IDENTICAL EDITABLE WORD | R12.95

AK-00 — RIGGING ANNEXURE SCOPE ACTIVATION & EVIDENCE INDEX

This is the seven-document original annexure activation index for underground rigging, chain blocks, winches and authorised shaft conveyance interfaces. The source expressly excludes statutory authority to operate or maintain mine winding systems.

WHERE THIS ORIGINAL APPLIES

Use when activating the mine safety-file scope, not as a field inspection. Complete Underground mine / site, Company, Work scope / location, Host area owner, Permit / RA version and Annexure active (Y/N), marking the applicable scope ACTIVE or N/A.

SEVEN ORIGINAL ANNEXURE DOCUMENT REFERENCES

1. AK-C01 — Prestart mine interface and trade-specific readiness

2. AK-F01 — Hold/release sign-off for critical work stages

3. AK-R01 — Trade risk, skills and permit/authorisation record

4. AK-T01 — Inspection/test/work-completion evidence

5. AK-R02 — Repeat inspection / defect and corrective action log

6. AK-TT01/02 — Two dedicated toolbox / shift briefing subjects

7. CORE A–AA / AB — Common incident, inspection, PPE, emergency, access and mine permits

HOW TO COMPLETE THE ORIGINAL WORD RECORD

For all seven genuine DOCUMENT, WHY / WHERE IT IS USED and SOURCE / EVIDENCE REF entries, include the real source record and approved mine workpack reference. These are seven document links, not seven PASS/FAIL checks.

MINE AUTHORITY, LOAD SAFETY AND STOP CONDITIONS

No contractor activity becomes permitted just because it appears in this index. Mine production, statutory winding and specialised engineering require independent qualified appointments and authorisation.

EVIDENCE AND AUTHORITY CONTROL

Record mine-issued load declarations, actual rigging certificates, rock-anchor engineering where required, competent signallers, safe load travel paths and receiving-mine signatures. Keep supporting documents with the original source form. Contractors cannot give themselves shaft, winder, suspended-load or mine production authority through a checklist.

BUY ONE ORIGINAL OR THE COMPLETE UNDERGROUND COLLECTION

The R12.95 editable AK-00 Word source is included in the 371-document Underground Mining Checklist Package and full 628-page Contractor H&S File. Owners of either complete collection should not buy the Single twice. Follow current mine engineering, shaft operator, lifting permits and formal acceptance.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

628-page Underground Mining Contractor H&S File

    bottom of page