176 - AJ-C03 | Airside Fleet Workface & SIMOPS Inspection
Buy 4 Checklists, Get 1 Free
WHY THIS SPECIALIST RECORD MATTERS
This actual SIMOPS field inspection checks aircraft movements, other trades and workfront hazards alongside specialist system requirements. Ground power units, baggage tugs, vehicle stairs and other ground equipment introduce rollaway, stored hydraulic energy, high-voltage, battery and fuel risks next to aircraft. A routine workshop signoff cannot permit return to an active apron or operational stand.
WHEN TO USE THE REAL WORKFRONT FORM
Identify the actual GSE unit, airport work zone, vehicle permit and competent specialist. Verify chocks, key/parking controls, stored-energy and hydraulic support, high-voltage GPU separation, battery or fuel protection, and a permitted road or apron test area. Enter the actual work-zone or asset details, contractor, approved work order and shift/date as applicable to the source; STOP when approvals or operating conditions are no longer valid.
WHAT THE ORIGINAL WORD ACTUALLY PRINTS
The original Word prints 9 numbered Y/N/N/A checks or acceptance gates: 1. Confirm scope, asset identity, isolation boundary and drawings match the approved work order. 2. Verify airport/airfield permission and safety-interface briefing for the current work window. 3. Check personnel authorisation, trade competence and supervision/escort arrangements. 4. Uncontrolled GSE rollaway — specific measures implemented and recorded. 5. high-voltage GPU — exclusion, barriers or protection verified. 6. Chocks/stands — physical condition checked with objective evidence. 7. tool count — test/inspection or release requirements understood. 8. Other trades, aircraft/vehicle routes, public protection and FOD risks coordinated. 9. Stop work and notify the airport custodian if the workfront or system state changes.
OBJECTIVE EVIDENCE AND SIGNATURES
Complete the original YES/NO/N/A evidence/defect fields, corrective action, contractor verification and airport/client review. The owner separately issues any operating-area release.
INDEPENDENT AIRPORT APPROVAL
The competent fleet/GSE owner and relevant airport authority must accept functional tests and explicitly authorise return to apron service. An AVC contractor inspection never grants airside driving or use permission.
SOURCE-ORIGINAL WORD AND COMPLETE AVC OPTIONS
This exact original editable AVC Word costs R12.95 individually. The identical form is already included in the 420-document Airports & Airside Checklist Package and complete 659-page Airports Contractor H&S File; avoid buying the same original twice. Eligible Singles may qualify for BUY 4 GET 1 FREE while the actual automatic checkout offer applies: 5 pay for 4, 10 for 8, 15 for 12. Confirm eligibility at checkout; full packages are excluded.

