top of page

173 - AN-C03 | Lifting & Material Handling Unexpected Condition STOP-WORK

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Automatic offer on eligible individual checklists: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Browse individual checklists. Confirm the discount in your cart before checkout.

173 - AN-C03 | Lifting & Material Handling Unexpected Condition STOP-WORK

WHERE / WHEN & WHY THIS DOCUMENT IS USED

Use this if the operating condition, permit boundary, hazard, scope or approved method unexpectedly changes. The original STOP-WORK form provides a documented, joint reassessment route, rather than treating an altered refinery condition as a normal site instruction. Here the trade is lifting and material handling, with a source-identified process exposure of lift impacts live process pipework or overhead services. Link the checks to actual equipment tags and the current facility-authorised scope.

THE SOURCE-PRINTED CONTROLS

The document contains EIGHT printed PROCESS / SAFETY VERIFICATION rows, each with Y, N and N/A decision boxes: (1) Current plant status and workface boundary reconfirmed with the facility area owner before activity; (2) Lift impacts live process pipework or overhead services; (3) Confirm lift path and exclusion over operating equipment, crane outrigger/ground pressure and permit for critical lifts; (4) New process, energy, chemical, ignition or SIMOPS condition recorded and work stopped pending reassessment; (5) Operator-controlled permit and isolation validity reconfirmed; no informal supervisor-only restart; (6) Affected adjacent trades, area operations and emergency response personnel advised of the deviation; (7) Engineering / environmental / quality nonconformity disposition filed where the change affects integrity; (8) Competent contractor supervisor and operator area authority jointly document permitted restart or cancellation.

HOW TO COMPLETE THE RECORD

Enter FACILITY / UNIT / EQUIPMENT, the true work order and operator PTW reference, plus contractor/shift. Inspect actual conditions, record EVIDENCE / OPEN ACTION / PERMIT VARIATION, and explain any N/A. The form requires separate CONTRACTOR / NAME & SIGN and FACILITY / AUTHORITY & SIGN with DATE / TIME. Keep underlying inspection, SDS, test or permission evidence as relevant to these exact controls.

STOP, HOLD & AUTHORITY LIMITS

The original HOLD RULE is explicit: an unanswered critical item, absent plant permit or unapproved deviation requires STOP/HOLD. A contractor tick, internal signature or completed checklist does not authorise release from an operating refinery. Resolve deficiencies with the competent technical reviewer and facility operator, and record the approved decision before progressing.

BUYING OPTIONS

This editable A4 Word (DOCX) form is R12.95. The 260-form Petrochemical Checklist Package costs R1,559.95; the complete 500-page Petrochemical H&S File is currently R1,899.95 and includes these records plus the full A–AA/AB/AC–AV framework. Site approval remains with the operator; prices can change.

Source code AN-C03 • Lifting and Material Handling • Editable DOCX

    bottom of page