173 - AJ-C02 | Airside Fleet Final Inspection & Airport Handover
Buy 4 Checklists, Get 1 Free
WHY THIS SPECIALIST RECORD MATTERS
The source-original final handover is used after actual testing, tool reconciliation, permit closeout and operator acceptance, never as a self-issued release. Ground power units, baggage tugs, vehicle stairs and other ground equipment introduce rollaway, stored hydraulic energy, high-voltage, battery and fuel risks next to aircraft. A routine workshop signoff cannot permit return to an active apron or operational stand.
WHEN TO USE THE REAL WORKFRONT FORM
Identify the actual GSE unit, airport work zone, vehicle permit and competent specialist. Verify chocks, key/parking controls, stored-energy and hydraulic support, high-voltage GPU separation, battery or fuel protection, and a permitted road or apron test area. Enter the actual work-zone or asset details, contractor, approved work order and shift/date as applicable to the source; STOP when approvals or operating conditions are no longer valid.
WHAT THE ORIGINAL WORD ACTUALLY PRINTS
The original Word prints 8 numbered Y/N/N/A checks or acceptance gates: 1. Work scope, installed assets and changes match approved documentation 2. Hydraulic and vehicle immobilisation 3. Lift equipment/mechanical checks 4. Brake, steering and alarm tests 5. Fuel/battery spill clearance 6. Tools, materials, barriers and FOD reconciled from airport zone 7. Work permits, isolations and other temporary restrictions formally closed 8. Fleet return-to-service
OBJECTIVE EVIDENCE AND SIGNATURES
Complete the original YES/NO/N/A evidence/defect fields, corrective action, contractor verification and airport/client review. The owner separately issues any operating-area release.
INDEPENDENT AIRPORT APPROVAL
The competent fleet/GSE owner and relevant airport authority must accept functional tests and explicitly authorise return to apron service. An AVC contractor inspection never grants airside driving or use permission.
PRACTICAL SITE AND CLOSEOUT CONTROL
Support raised equipment mechanically rather than relying on hydraulic pressure, and reconcile every tool, battery lead and fastener before demobilisation. Keep steering, brakes, alarms, emergency stops and tests traceable to the actual tagged unit. Coordinate relevant work-window variations with the airport operations or facilities custodian and hand over any incomplete inspection evidence by documented reference.
SOURCE-ORIGINAL WORD AND COMPLETE AVC OPTIONS
This exact original editable AVC Word costs R12.95 individually. The identical form is already included in the 420-document Airports & Airside Checklist Package and complete 659-page Airports Contractor H&S File; avoid buying the same original twice. Eligible Singles may qualify for BUY 4 GET 1 FREE while the actual automatic checkout offer applies: 5 pay for 4, 10 for 8, 15 for 12. Confirm eligibility at checkout; full packages are excluded.

