17 - AB-13-C01 | Underground Fire, Gas & Inundation Emergency Check
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — EDITABLE SOURCE-ORIGINAL WORD | R12.95
AB-13-C01 — UNDERGROUND FIRE, GAS & INUNDATION EMERGENCY CHECK
This authentic AB-13-C01 Underground Mining Word form contains 10 printed mine safety release and workface verification points. Each buyer gets the real editable source document, not a generic substitute; every source point is identified below.
APPLICATION TO THE ACTUAL MINE WORK ORDER
Use this Underground Fire, Gas & Inundation Emergency Check for the relevant underground mine work zone, company, work order, assigned supervisor, shift and permitted task. Complete the source's location/asset and responsibility fields and confirm site-specific mine COP/SOP revisions.
TEN ORIGINAL SOURCE SAFETY VERIFICATION POINTS
1. Mine current underground fire/emergency plan and site alarms received.
2. Escape routes, refuge bay and self-rescuer use briefed for exact area.
3. Gas/explosion, smoke migration, conveyor fire and fuel load scenarios assessed.
4. Flooding/mud rush/water inflow, seismic/fall-of-ground emergency response planned.
5. Emergency communications, control room and surface contacts tested.
6. Fire-system impairment controlled with accepted alternative protection.
7. Rescue capability and first-aid response time accepted for task and shift.
8. No contractor attempts mine rescue, firefighting or gas-clearance outside approved competence.
9. All workers know who authorises re-entry, evacuation and reinstatement.
10. Exercises, drill attendance and emergency briefing record filed as required.
HOW TO COMPLETE THE ORIGINAL WORD
Mark the ten actual RELEASE / VERIFICATION POINT lines YES, NO or N/A with EVIDENCE / ACTION; explain defects, capture actual source documents, technical results and named mine review.
CRITICAL MINE STOP WORK AND OPERATOR AUTHORITY
Any NO against a critical risk, missing mine permit, unresolved hazard or failed emergency protection requires stop, escalation, correction and new mine-owned release. Contractor sign-off never overrides a host mine statutory controller's responsibility for incident response or plant restart.
INDIVIDUAL SOURCE WORD OR COMPLETE MINE COLLECTION
This R12.95 AB-13-C01 original is included in the complete 371-document Underground Mining Checklist Package and 628-page Contractor Health and Safety File. Owners of either should avoid duplicate purchase. Actual mine access and technical acceptance remain required.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles