top of page

17 - AB-13-C01 | Shift Pre-Start, Work Briefing & Handover

R 12,95Price

Buy 4 Checklists, Get 1 Free

OPENCAST MINING SINGLES OFFER: Each original editable Microsoft Word form costs R12.95. For eligible Singles, add five and pay for four, ten for eight or fifteen for twelve while the cart promotion applies.

AB-13-C01 — SHIFT PRE-START, WORK BRIEFING & HANDOVER

You've won work at an operational surface mine. Shift Pre-Start, Work Briefing & Handover requires real mine-site checks and authorised decisions, not a template

TEN ACTUAL YES/NO/N/A VERIFICATION POINTS

1. The current job/permit scope matches signed work order and drawings.

2. List of personnel/visitors and supervisors current.

3. Changes in blasting, weather, pit conditions and haul routes briefed.

4. Equipment and LOTO inspected and defect escalation completed.

5. SIMOPS conflicts and production movements communicated.

6. Latest area emergency arrangement and communications reconfirmed.

7. Current risk assessment and tool talks signed by all affected.

8. Permits signed/active, owner/expiry and rescue confirmed.

9. Outstanding hold points and equipment states handed to next shift.

10. Secure area, clean up, close permits and reconcile headcount at shift end.

EXACT WORD RECORD FIELDS AND EVIDENCE

This original is a 10-row mine contractor checklist. Each printed RELEASE / VERIFICATION POINT uses YES, NO, N/A and EVIDENCE / ACTION. Explain N/A, retain open NO items and document the actual evidence.

The source provides Mine / site, Contractor / company, Area / zone, Date / shift, Work order / activity and Supervisor. Separate CONTRACTOR CHECK and MINE / HOST RELEASE signatures record the actual DATE / REFERENCE. This does not create permission by itself.

STOP / HOLD — ONLY COMPETENT MINE RELEASE COUNTS

The printed RELEASE RULE requires stop, escalation, documented correction and new release for every NO against a critical risk. A contractor's tick cannot override the mine's operating rules, mine permits or competent work-release decisions.

PREPARE THE WORD ORIGINAL FOR YOUR CONTRACT

Insert your business and mine particulars, actual zone, date/shift, permit, worker details and responsible signatories. Follow the source order; attach

ONE R12.95 SINGLE OR THE COMPLETE CONTRACTOR SYSTEM?

This exact editable AB-13-C01 original is ALREADY INCLUDED inside AVC's 386-document Surface, Opencast & Quarry Mining Checklist Package AND within the complete Surface Mining Contractor Health & Safety File. Don't buy it again if you own either larger product. The complete file additionally includes the professional contractor-management foundation.

Browse all AVC Safety Checklist Singles.

Compare the full 386-document Surface Mining Checklist Package.

See the complete Surface Mining Contractor Health & Safety File.

This source is supporting contractor evidence only, not statutory mine accreditation, mine approval, a blasting permission, equipment restart authority or a substitute for the current mine COP/SOP and issued permits.

    bottom of page