top of page

165 - AJ-C03 | Mine Stores Emergency Safeguards Checklist

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Qualifying AVC Singles: five for four, ten for eight or fifteen for twelve. Confirm cart offer.

Browse all checklist Singles

165 / AJ-C03 — MINE STORES EMERGENCY SAFEGUARDS AND CRITICAL EXPOSURE

AJ-C03 is the original editable SEVEN-CONTROL emergency safeguards and critical exposure checklist for hazardous mine stores, deliveries, chemicals and consumables. It begins with compatibility of chemical stocks and ends with acceptance of the consignment's actual escorted entry route.

WHY THIS MINE DELIVERY AND STORAGE CONTROL MATTERS

An emergency spill may occur amid live forklifts, active haul roads and incompatible stored chemicals. Uncontrolled fuel or oxidiser storage can escalate a fire; an obstructed emergency access route prevents response. This checklist connects storage, delivery, waste and mine traffic controls before the receiving operation continues.

SEVEN SOURCE-CONTROLLED EMERGENCY / CHANGED CHECKS

1. Segregate fuel, oxidisers, chemicals and gas cylinders; SDS accessible. 2. Approve forklifts, pedestrian routes and pit/fleet crossings before unloading. 3. Check rack load rating, bund integrity and fire separation. 4. Exclude explosives and blast accessories from ordinary stores without permits.

5. Track spent batteries and contaminated waste to authorised disposal. 6. Issue critical spare parts against equipment serials and maintenance handback. 7. Confirm mine gate, escort, consignment route and unloading zone.

REAL EDITABLE WORD SOURCE FIELDS AND MINE AUTHORITY

Seven authentic WORKFACE VERIFICATION / REQUIRED CONTROL rows with Y, N, N/A and EVIDENCE / DEFECT / ACTION; source identifiers include MINE / PIT / WORK AREA, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. Evidence and justification are required for any NO/N/A; no statutory explosives-authorisation box is provided.

The printed HOLD instructs stopping for missing clearance, protection, isolation or critical evidence and reassessing changed conditions. Separate contractor supervisor and MINE RELEASE AUTHORITY signatures plus DATE / RELEASE REF record authority to proceed.

ONE EDITABLE CHECKLIST SINGLE OR COMPLETE MINE COLLECTION?

This original purchaser-licensed editable Word DOCX is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and in the complete Surface Mining Contractor Health and Safety File. The larger collections include this individual document with other specialist controls and mine contractor management tools. Buyers of the larger collection do not need to purchase the same Single again. Mine permit, environmental, delivery and controlled-substance authorities remain separate.

386-document Surface Mining Checklist Package

Complete Surface Mining Contractor H&S File

    bottom of page