164 - AJ-C02 | Mine Stock Handling Changed-Conditions Checklist
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Qualifying AVC Singles: five for four, ten for eight or fifteen for twelve. Confirm cart offer.
164 / AJ-C02 — MINE STOCK HANDLING CHANGED CONDITIONS AND REASSESSMENT
AJ-C02 is the original editable SEVEN-ROW changed-conditions reassessment checklist for mine logistics after a blast, weather event, different delivery vehicle, crew shift or altered storage arrangement. It begins with the current goods-received/batch record so that later chemical and traffic decisions relate to the correct consignment.
WHY THIS MINE DELIVERY AND STORAGE CONTROL MATTERS
A relocated drum or replaced pallet can create an incompatible chemical stack even when the original area was approved. A new forklift route can cross active pit haulage, while a changed waste consignment or critical-spare issue may break traceability. This form requires the storekeeper and mine owner to reconsider the whole chain.
SEVEN SOURCE-CONTROLLED EMERGENCY / CHANGED CHECKS
1. Recheck receipt quantity, batch/expiry, critical spare trace and reported defect. 2. Confirm SDS and segregation of fuel, oxidisers, chemicals and cylinders. 3. Re-approve forklift/pedestrian/haul-route crossing for current shift. 4. Verify storage racking, bund protection and authorised fire separation.
5. Exclude explosives/blast accessories without statutory permission. 6. Confirm contaminated materials, used batteries and waste destinations. 7. Trace issue of serialised critical parts to equipment maintenance handback.
REAL EDITABLE WORD SOURCE FIELDS AND MINE AUTHORITY
All seven printed WORKFACE VERIFICATION / REQUIRED CONTROL items use Y / N / N/A and EVIDENCE / DEFECT / ACTION, from GRN quantity and expiry through chemical SDS, route/rack controls, explosives exclusion, waste and serialised parts handback. It records mine/pit/work area, work order/zone, date/shift/permit and contractor supervisor rather than invented weather limits.
HOLD the delivery or issue for missing protection, clearance, current evidence or mine authorisation. Contractor supervisor and MINE RELEASE AUTHORITY sign separately with DATE / RELEASE REF after changed conditions are reassessed.
ONE EDITABLE CHECKLIST SINGLE OR COMPLETE MINE COLLECTION?
This original purchaser-licensed editable Word DOCX is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and in the complete Surface Mining Contractor Health and Safety File. The larger collections include this individual document with other specialist controls and mine contractor management tools. Buyers of the larger collection do not need to purchase the same Single again. Mine permit, environmental, delivery and controlled-substance authorities remain separate.

