163 - AJ-C01 | Mine Fire & Suppression Ten-Point Task Prestart Checklist
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95
AJ-C01 — MINE FIRE & SUPPRESSION TEN-POINT TASK PRESTART CHECKLIST
The genuine TEN-point underground fire-system prestart covers mine fire-owner permission, alarm and refuge impairment, crew warnings, hot-work risk, emergency call continuity, fire-water, discharge exclusion, flameproof components, cause-and-effect tests and closed restoration.
WHERE AND WHEN THIS ORIGINAL MINE FIRE RECORD APPLIES
Use before permitted mine fire-system maintenance. Record mine/site, contractor, area, date/shift, work order and supervisor; explain any N/A using current mine rules.
TEN ORIGINAL FIRE SYSTEM PRESTART CONTROLS
1. Mine fire/ventilation emergency owners have approved scope and compensatory arrangements.
2. Any detection, alarm, suppression or refuge system impairment assessed before disconnecting.
3. Mine crew, control room and adjacent personnel warned about system isolation.
4. Atmosphere and fire risks assessed before hot work or thermal/spark-producing test.
5. Gas detection and emergency communication system continuity preserved or compensated.
6. Fire-water supply, pressure and alternative firefighting coverage verified.
7. Test/discharge zones closed to personnel and protected from stored pressure.
8. Intrinsically safe/flameproof equipment status and cable entry controlled.
9. Cause-and-effect alarm, ventilation shutdown and suppression tests approved by mine owner.
10. System fully reinstated; impairment/standing orders closed and evidence filed.
HOW TO COMPLETE THE SOURCE WORD FIELDS
Complete ten original RELEASE / VERIFICATION POINT rows YES/NO/N/A and EVIDENCE / ACTION. Obtain actual permit and pressure evidence, test results, protection controls and mine owner approval.
MINE FIRE SAFETY AND AUTHORISED RETURN TO SERVICE
The RELEASE RULE requires operator-owned holds cleared before work. CONTRACTOR CHECK and MINE / HOST RELEASE are separate.
EXACT EDITABLE WORD AND COMPLETE FILE OPTIONS
This R12.95 original editable AJ-C01 Word record is also in the 371-form Underground Mining Checklist Package and complete 628-page Contractor H&S File. Buyers who own either containing collection should avoid a duplicate. The mine emergency/fire owner alone approves fire impairment, alternate protection, witnessed testing and reinstatement.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

