1. Secure approval of the mine haul-road interface and traffic management plan.
2. Locate and mark buried services and obtain any isolate/mark permission.
3. Have a competent person assess support, slope stability and edge loads.
4. Coordinate heavy TMM crossings, reversing and road closures with mine traffic control.
5. Maintain authorised temporary route, signs and barriers until formal traffic-authority reopening.
PRINTED EVIDENCE AND FIELD STRUCTURE
This is the actual AVC AI-TT01 five-point haul-road toolbox talk for Surface Earthworks, Trenching, Civils and Roadworks. Mine/area, shift/date, work order/task, contractor, presenter and RA reference; five numbered briefing themes followed by NAME/STAFF NO. and SIGNATURE entries, not an assumed 16-line form.
STOP-WORK, HOLD AND MINE AUTHORITY
Stop on unmarked services, unstable excavation, failed traffic barrier or blast alerts. Only mine traffic authority reopens closed haul roads.
PRACTICAL WORKFACE USE
Use before culverts, haul-road repairs, pipe crossings and live traffic route diversions. The purchaser receives the editable source DOCX for site particulars, real test results and retention in the applicable work-order file. Project-specific conditions and supporting authorisations must still be verified.
WHICH PRODUCT SHOULD YOU BUY?
Buy this Single if you need only mine haul-road work & separation. The IDENTICAL original Word document is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package AND in the complete Surface Mining Contractor Health and Safety File. If you purchased either larger product, do not buy this Single again.
Browse all individually editable Checklist Singles
Explore the complete 386-document Surface Mining Checklist Package
Explore the full Surface Mining Contractor Health & Safety File
AVC safety records preserve a traceable decision, rather than inventing a permit or authorisation. Use the mine's current site procedures, risk assessments and named release authority; keep failed controls open until actual evidence or release is recorded.