151 - AI-F01 | Stores Hold, Release & Mine Handover Record
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95
AI-F01 — STORES HOLD, RELEASE & MINE HANDOVER RECORD
Five original mine-authority hold/release stages covering approved underground stores and shaft conveyance, hazardous fire load, containment, battery/spill checks and stores handback.
WHERE TO USE THIS UNDERGROUND SOURCE
Use before each critical stage of authorised material, fuel, chemical or battery work. Complete Underground mine / site, Company, Area / equipment, Permit / work order, Supervisor and Host-mine work owner.
FIVE REAL MINE STORES HOLD AND RELEASE STAGES
1. Underground materials approval and shaft/conveyance release
2. Fire load/ventilation and hazardous goods acceptance
3. Storage/bunding and lifting/stacking inspection
4. Chemical spill, battery/flammable control verification
5. Mine stores/ventilation end-of-shift acceptance
COMPLETING THE SOURCE-ORIGINAL WORD RECORD
For five STEP / HOLD / STOP POINT entries tick Hold, Release or N/A; document actual VERIFIER / RECORD evidence, time and signature. Include approved shaft permits, stock declarations, storage inspection and mine stores acceptance.
STOP-WORK AND OPERATOR-OWNED MINE AUTHORITY
The original NO RELEASE IF requires witnessed holds and mine authorisation before proceeding. FINAL CONTRACTOR ACCEPTANCE differs from the required HOST-MINE RELEASE.
PRACTICAL EVIDENCE AND CONTROL OWNERSHIP
Preserve true mine work order, material class, approved store location, chemical SDS, fuel and gas segregation, shaft transport declarations and witnessed acceptance. A contractor sign-off cannot issue mine permissions or accept prohibited goods. Keep stock movement, batch identity, waste return and competent inspection evidence with this editable source form.
ORIGINAL SINGLE OR COMPLETE UNDERGROUND FILE
The R12.95 AI-F01 original Word form is already included in the 371-document Underground Mining Checklist Package and full 628-page Contractor H&S File. Existing package/file owners should avoid buying a duplicate. The appointed mine stores, fire, ventilation and transport officials retain operating and return-to-service release authority.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

