top of page

150 - AL-R01 | Lifting Operator Competency and Permit Register

R 12,95Price

Buy 4 Checklists, Get 1 Free

SOURCE-ORIGINAL NUCLEAR LIFTING WORD

AVC AL-R01 source-original editable Word for lifting operator competency and permit register on nuclear power station workfronts. Cranes and load movements above operating equipment can threaten nuclear safety-related cables, piping, instruments and redundant systems even when the lifted item is non-safety-related. An AVC contractor record supports the plant work package and qualified inspections; it does not grant permission to move loads across a protected station boundary.

WHEN AND WHERE TO COMPLETE

Complete the actual nuclear facility, unit, contractor work zone and approved lift work order or drawing revision, current station permit and QA significance. Identify the crane or hoist asset, load mass and centre of gravity, rigging rating, certified operator and signaller, approved route, supports, exclusion area and emergency/safe landing method. Confirm who owns nearby operating equipment and independent station lifting release.

ACTUAL PRINTED SOURCE CONTENT

Seven source register headings PERSON / ASSET, COMPETENCY, WORK ID / REV, PERMIT / HOLD, TEST / DOC, STATUS and SIGN with controller and revision. Verify operator, lifting supervisor, rigger, tackle and work permit evidence.

REAL PRINTED EVIDENCE AND CHECKS

Fill the five or seven authentic source register columns with actual equipment identifiers, load ratings, person competence, relevant test and station reviewer evidence. Retain approved lift plan, calculated rigging and ground support, tested tackle certificates, measured load, permit and exclusion diagram, pre-lift QA hold, record of damage or snag and as-left material count.

CRITICAL LIFT AND PROTECTED EQUIPMENT CONTROLS

No load should travel over operating, redundant or nuclear safety-significant plant without an approved engineering/operations-reviewed plan. Confirm weather, communications, clearance to structure, ground capacity, overlapping work and radiological/security boundaries. Quarantine unidentified or damaged lifting gear. An unexpected obstruction, shock load, dropped item or loss of banksman signals requires STOP, incident reporting and a fresh approval before a lift can resume.

FINAL HANDOVER AND WORD PACKAGE OPTIONS

Record load landing, tie-down condition, returned rigging/tackle, missing components, removed barricades, any protected-equipment contact and receiving operator release. Original editable Word Single costs R12.95, already included in the 228-document Nuclear Facility Checklist Package and complete 461-page Nuclear Contractor H&S File. Avoid double purchase. Eligible Singles may qualify for BUY 4 GET 1 FREE while checkout offer is active; check cart. Full packages excluded.

Browse AVC Checklist Singles

228-document Nuclear Checklist Package

461-page Nuclear Facility H&S File

    bottom of page