148 - AI-C01 | Earthworks & Haul-Road Ten-Point Pre-Start
Buy 4 Checklists, Get 1 Free
SURFACE MINING SINGLES OFFER — buy 5 individual documents for the price of 4, 10 for 8 or 15 for 12. This original editable Word Single is R12.95.
WHY THIS ORIGINAL CONTROL MATTERS
Operational haul-road work needs explicit traffic separation, service location and ground protection before the first machine enters the work zone. This original contains TEN checks and separate host-mine release evidence.
REAL PRINTED POINTS — IN SOURCE ORDER
1. Confirm approved mine road traffic management plan.
2. Obtain permission to locate, mark and isolate buried services.
3. Competent person assesses excavation support, stability and edge loads.
4. Coordinate heavy TMM crossings, reversing and closure with traffic control.
5. Barricade excavations and monitor weather/water ingress.
6. Set equipment, stockpiles and spoil to approved edge distances.
7. Inspect temporary support, shoring, access and egress each shift.
8. Control runoff and dewatering discharge to mine environmental rules.
9. Verify compaction and underground service reinstatement records.
10. Obtain explicit host-mine road reopening release.
PRINTED EVIDENCE AND FIELD STRUCTURE
This is the actual AVC AI-C01 ten-point Y/N/N/A readiness checklist for Surface Earthworks, Trenching, Civils and Roadworks. Ten numbered Y/N/N/A RELEASE/VERIFICATION POINTS with EVIDENCE/ACTION, mine/site/area and supervisor/work-order fields; separate contractor check and mine/host release signatures and date/ref.
STOP-WORK, HOLD AND MINE AUTHORITY
A failed critical subject is referred to the responsible mine official. Applicable high-risk and operator-owned holds must be formally released before start.
PRACTICAL WORKFACE USE
Use at mine roadworks, culverts, trenching, service crossings, dewatering and restoration sites. The purchaser receives the editable source DOCX for site particulars, real test results and retention in the applicable work-order file. Project-specific conditions and supporting authorisations must still be verified.
WHICH PRODUCT SHOULD YOU BUY?
Buy this Single if you need only ten-point task readiness & pre-start. The IDENTICAL original Word document is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package AND in the complete Surface Mining Contractor Health and Safety File. If you purchased either larger product, do not buy this Single again.
Browse all individually editable Checklist Singles
Explore the complete 386-document Surface Mining Checklist Package
Explore the full Surface Mining Contractor Health & Safety File
AVC safety records preserve a traceable decision, rather than inventing a permit or authorisation. Use the mine's current site procedures, risk assessments and named release authority; keep failed controls open until actual evidence or release is recorded.

