top of page

142 - AH-T01 | Mine Dewatering & Pump Systems Work Inspection Test Record

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95

AH-T01 — MINE DEWATERING & PUMP SYSTEMS WORK INSPECTION TEST RECORD

The original seven-row underground water, dewatering and pump inspection/test record captures criticality, inflow and standby pumping, confined sump rescue, pipe support and pressure tests, automatic pump starts, flood/level alarms and mine-owner handback.

WHEN THIS MINE DEWATERING RECORD IS REQUIRED

Use after permitted mine pump, pipe, sump and related critical water-system work. Complete Underground mine / site, Contractor, Item / system / asset ID, Work order, Drawing / revision and Activity date using the current mine water asset list.

SEVEN SOURCE MINE PUMP INSPECTION AND TEST ITEMS

1. Pump/pipe ID, duty and mine criticality classification

2. Upstream water assessment, redundancy and isolation

3. Confined entry and sump gas/rescue checklist

4. Pipe support inspection and pressure/leak testing

5. Pump motor, valves and auto-start functional checks

6. Flood/level alarms, discharge and contamination evidence

7. Mine water-system return-to-service acceptance

HOW TO COMPLETE THE AUTHENTIC WORD FIELDS

For seven TEST / COMPLETION RECORD rows enter true RESULT / MEASUREMENT and SOURCE / SIGN-OFF. Attach pump duty sheets, inflow and redundancy analysis, confined entry/gas test, pipe pressure/leak evidence, functional controls and mine water-system receiving signature.

MINE WATER OPERATOR, FLOODING AND STOP-WORK RULES

The source expressly says blank results are not evidence. A failed flood alarm, unsecured piping or unverified pump auto-start prevents return to service until the mine representative accepts operator-approved close-out.

CONTROLLED EVIDENCE AND SAFETY RESPONSIBILITY

Keep genuine mine pump criticality classifications, upstream water levels, redundant water service, rescue arrangements, valve positions, pressure release and witnessed test results with the editable Word original. Mine-owned emergency alarm systems, flood evacuation routes and water-system restart cannot be accepted by contractor signatures alone.

SINGLE ORIGINAL OR FULL UNDERGROUND SAFETY COLLECTION

This R12.95 AH-T01 Word source is already included in the 371-original Underground Mining Checklist Package and complete 628-page Contractor H&S File. Owners of either full collection should avoid a duplicate purchase. Only mine-appointed dewatering, ventilation, engineering and emergency owners can authorise critical system isolation and return to service.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Complete 628-page Underground Mine Contractor H&S File

    bottom of page