AH-R04 — DEWATERING DEFECTS & REINSTATEMENT TRACEABILITY REGISTER
Seven authentic mine dewatering reinstatement evidence checks: starts with mine-owner confirmation of water levels/alarms/restart; ends with accepted flood escape and rise triggers.
ORIGINAL MINE WATER SYSTEM WORK SCOPE
Use after authorised pump, pipe, sump or standby pumping work. Enter MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR, recording the correct mine system owner.
SEVEN REAL UNDERGROUND DEWATERING EVIDENCE ITEMS
1. Mine dewatering owner validates levels, alarms and restart after works
2. Pump electrical immersion risk, cable protection and mechanical guarding assessed
3. Temporary bypass pumps and standby power proven before isolating duty system
4. Pressure release and non-return valves inspected before line-breaking
5. Uncontrolled cross-connections and backflow prevented in temporary hose arrangements
6. Potential contamination, sediment and acid water exposure assessed
7. Emergency flood route, escape levels and water-rise trigger agreed with operator
FILLING THE REAL PRINTED WORD SOURCE FIELDS
For the seven MINING-SPECIFIC ITEM / EVIDENCE TO TRACK rows document measured value, dated source and authority status. Attach water logs, standby-capacity tests, isolation certificate, reinstatement evidence and actual mine acceptance.
MINE DEWATERING STOP-WORK AND RELEASE
Retain original NCR/reinspection and signature/close-out fields. Do not restore a critical pump with deficient capacity, unknown pressure, failed alarm or blocked flood route. A contractor cannot issue mine plant release.
TECHNICAL EVIDENCE AND MINE SAFETY RESPONSIBILITY
Maintain current upstream inflow measurements, water level logs, accepted standby pumping, witnessed pressure/pipe tests, electrical immersion controls, flood refuge and evacuation information. This genuine editable Word is a contractor evidence form; it cannot replace mine water engineering, isolation or plant restart permission.
SINGLE ORIGINAL OR FULL MINE COLLECTION
This R12.95 AH-R04 Word Single is already included in the 371-original Underground Mining Checklist Package and the 628-page Contractor H&S File. Existing collection owners should avoid duplicate purchases. Keep approved work orders, witness records, flood emergency and appointed mine official acceptance together with the form.