139 - AH-R02 | Dewatering Defects & Corrective Action Log
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95
AH-R02 — DEWATERING DEFECTS & CORRECTIVE ACTION LOG
The original five-column OPEN-ENTRY defects and corrective-action register for pumps, sumps, drainage, pressure and emergency flooding. It contains no prefilled seven-point technical checklist; the contractor records real findings.
ORIGINAL MINE WATER SYSTEM WORK SCOPE
Use for real pump, valve, pipe, standby power, leaking sump and alarm defects. Identify Underground mine / site, Company, Contract / work order and Responsible person against each actual incident or inspection.
FIVE ACTUAL SOURCE OPEN-ENTRY COLUMNS
ITEM / LOCATION
DEFECT / CONTROL
OWNER / TARGET
ACTION / EVIDENCE
ACCEPTED / CLOSED
FILLING THE REAL PRINTED WORD SOURCE FIELDS
Complete genuine ITEM / LOCATION, DEFECT / CONTROL, OWNER / TARGET, ACTION / EVIDENCE and ACCEPTED / CLOSED columns. Attach dated pressure/level readings, photographs, remedial ownership, due date and mine acceptance.
MINE DEWATERING STOP-WORK AND RELEASE
The original CONTROL clause requires renewed entries after changed workers, equipment, authorisations, scope or mine hazards. Open high-consequence water faults bar affected work until accepted by competent mine officials.
TECHNICAL EVIDENCE AND MINE SAFETY RESPONSIBILITY
Maintain current upstream inflow measurements, water level logs, accepted standby pumping, witnessed pressure/pipe tests, electrical immersion controls, flood refuge and evacuation information. This genuine editable Word is a contractor evidence form; it cannot replace mine water engineering, isolation or plant restart permission.
SINGLE ORIGINAL OR FULL MINE COLLECTION
This R12.95 AH-R02 Word Single is already included in the 371-original Underground Mining Checklist Package and the 628-page Contractor H&S File. Existing collection owners should avoid duplicate purchases. Keep approved work orders, witness records, flood emergency and appointed mine official acceptance together with the form.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

