top of page

136 - AH-F01 | Mine Dewatering Hold, Release & Handover Record

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95

AH-F01 — MINE DEWATERING HOLD, RELEASE & HANDOVER RECORD

Five genuine mine-controlled hold/release stages for underground water, sump, pumping and drainage work. Covers flood backup, mine pump isolation, pipe pressure, high-level alarms and mine dewatering or fire-water handback.

WHERE THE ORIGINAL MINE WATER FORM APPLIES

Use between critical technical stages. Record Underground mine / site, Company, Area / equipment, Permit / work order, Supervisor and Host-mine work owner against the live mine permit.

FIVE MINE-OWNED ORIGINAL HOLD/RELEASE POINTS

1. Water ingress/inundation exposure and emergency backup approval

2. Mine pump/electrical/pressure isolation and sump-entry release

3. Pipe/support, alignment and pressure acceptance

4. Pump start-up, high-level alarms and capacity testing

5. Mine dewatering/fire-water authority handback

COMPLETING ACTUAL PRINTED WORD SOURCE FIELDS

Mark Hold, Release or N/A for five source STEP / HOLD / STOP POINT rows, retaining real VERIFIER / RECORD evidence, time and signature. Keep actual pump/pipe test and operator release documents.

STOP-WORK AND MINE WATER SYSTEM RELEASE

NO RELEASE IF a required mine permit, witnessed technical hold or mine acceptance is missing. Contractor and host-mine approvals must remain separate.

EVIDENCE AND CONTROLLING MINE AUTHORISATIONS

Keep actual water-level and upstream inflow logs, pump duty/standby tests, authorised isolation, pressure/valve acceptance, flood escape, confined sump rescue and receiving mine owner sign-off with the original editable Word record. Completion does not independently authorise critical mine pump operation, mine technical duties or a work-area release.

BUY A SINGLE ORIGINAL OR THE COMPLETE MINE FILE

This R12.95 source-identical AH-F01 Word Single is already in the 371-document Underground Mining Checklist Package and complete 628-page Contractor H&S File. Existing owners should avoid buying it again. Mine-appointed water, engineering and emergency authorities remain responsible for safe dewatering-system release.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

628-page Underground Mining Contractor H&S File

    bottom of page