top of page

134 - AH-C02 | Mine Dewatering Shift & Area Readiness Checklist

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95

AH-C02 — MINE DEWATERING SHIFT & AREA READINESS CHECKLIST

The seven original dewatering shift readiness points start with protected critical pump duty during approved isolation and end with controls against pump immersion, exposed cables and missing guards.

WHERE THE ORIGINAL MINE WATER FORM APPLIES

Use at the start of an underground water shift or following changed hazards. Enter MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR.

SEVEN ORIGINAL MINE WATER SAFETY CONTROLS

1. Approved pump and line isolation maintains critical mine dewatering capacity

2. Emergency flood route, escape levels and water-rise trigger agreed with operator

3. Potential contamination, sediment and acid water exposure assessed

4. Uncontrolled cross-connections and backflow prevented in temporary hose arrangements

5. Pressure release and non-return valves inspected before line-breaking

6. Temporary bypass pumps and standby power proven before isolating duty system

7. Pump electrical immersion risk, cable protection and mechanical guarding assessed

COMPLETING ACTUAL PRINTED WORD SOURCE FIELDS

Record Y, N, N/A and EVIDENCE / DEFECT / ACTION against seven printed source rows, with actual water-rise trigger, backflow, pressure and emergency standby evidence.

STOP-WORK AND MINE WATER SYSTEM RELEASE

HOLD when dewatering cover, mine clearance, rescue/flood route or critical technical evidence is absent. A previous-shift tick is not renewed mine permission.

EVIDENCE AND CONTROLLING MINE AUTHORISATIONS

Keep actual water-level and upstream inflow logs, pump duty/standby tests, authorised isolation, pressure/valve acceptance, flood escape, confined sump rescue and receiving mine owner sign-off with the original editable Word record. Completion does not independently authorise critical mine pump operation, mine technical duties or a work-area release.

BUY A SINGLE ORIGINAL OR THE COMPLETE MINE FILE

This R12.95 source-identical AH-C02 Word Single is already in the 371-document Underground Mining Checklist Package and complete 628-page Contractor H&S File. Existing owners should avoid buying it again. Mine-appointed water, engineering and emergency authorities remain responsible for safe dewatering-system release.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

628-page Underground Mining Contractor H&S File

    bottom of page