top of page

133 - AH-C01 | Mine Dewatering Ten-Point Task Prestart Checklist

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95

AH-C01 — MINE DEWATERING TEN-POINT TASK PRESTART CHECKLIST

TEN actual original prestart points cover critical pump classification, inflow, backup, isolated energy, sump rescue, high-water alarms, overhead pipe support, potable backflow, approved sludge discharge and mine-authorised restoration.

WHERE THE ORIGINAL MINE WATER FORM APPLIES

Use before mine water work. Fill mine/site, contractor, zone, shift, work order and supervisor; follow actual owner approvals.

TEN GENUINE UNDERGROUND DEWATERING PRESTART CHECKS

1. Asset owner identifies whether pump/pipe forms a critical dewatering, emergency or fire-water system.

2. Underground flooding/water pressure and upstream inflow conditions reviewed with mine water engineer.

3. Redundant pumping and mine emergency controls confirmed before critical pump isolation.

4. Electrical, hydraulic, pressure, mechanical and check-valve trapped energy isolated.

5. Confined sump/tank entry has mine-specific atmospheric test, attendant and rescue.

6. Falling water level, inundation and overflow alarms monitored during outage.

7. Pipe hanging/support and corrosion/load assessment approved for underground roof/sidewall.

8. Backflow/cross-contamination and disinfection/quality controls accepted for potable water.

9. Test water/spills/sludge discharged by mine-approved route without harming production/escape.

10. Mine pump control and safe restoration acceptance documented before operation.

COMPLETING ACTUAL PRINTED WORD SOURCE FIELDS

For TEN RELEASE / VERIFICATION POINT source items, mark YES, NO or N/A with EVIDENCE / ACTION and formal mine release.

STOP-WORK AND MINE WATER SYSTEM RELEASE

The original RELEASE RULE requires every high-risk and mine-owned hold released; contractor check cannot replace the mine/host release.

EVIDENCE AND CONTROLLING MINE AUTHORISATIONS

Keep actual water-level and upstream inflow logs, pump duty/standby tests, authorised isolation, pressure/valve acceptance, flood escape, confined sump rescue and receiving mine owner sign-off with the original editable Word record. Completion does not independently authorise critical mine pump operation, mine technical duties or a work-area release.

BUY A SINGLE ORIGINAL OR THE COMPLETE MINE FILE

This R12.95 source-identical AH-C01 Word Single is already in the 371-document Underground Mining Checklist Package and complete 628-page Contractor H&S File. Existing owners should avoid buying it again. Mine-appointed water, engineering and emergency authorities remain responsible for safe dewatering-system release.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

628-page Underground Mining Contractor H&S File

    bottom of page