132 - AH-00 | Mine Dewatering Annexure Scope & Evidence Index
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95
AH-00 — MINE DEWATERING ANNEXURE SCOPE & EVIDENCE INDEX
This authentic seven-document annexure activation index covers mine-authorised pipework, pumps, sumps, drains, process/potable water, sewage and ancillary fire-water. Its entries are document references, not seven field safety checks.
WHERE THE ORIGINAL MINE WATER FORM APPLIES
Use at safety-file activation. Fill Underground mine / site, Company, Work scope / location, Host area owner, Permit / RA version and Annexure active (Y/N).
SEVEN ORIGINAL SOURCE DOCUMENT CROSS-INDEX ENTRIES
1. AH-C01 — Prestart mine interface and trade-specific readiness
2. AH-F01 — Hold/release sign-off for critical work stages
3. AH-R01 — Trade risk, skills and permit/authorisation record
4. AH-T01 — Inspection/test/work-completion evidence
5. AH-R02 — Repeat inspection / defect and corrective action log
6. AH-TT01/02 — Two dedicated toolbox / shift briefing subjects
7. CORE A–AA / AB — Common incident, inspection, PPE, emergency, access and mine permits
COMPLETING ACTUAL PRINTED WORD SOURCE FIELDS
Complete true DOCUMENT, WHY / WHERE IT IS USED and SOURCE / EVIDENCE REF fields for each printed linked form and mine approval.
STOP-WORK AND MINE WATER SYSTEM RELEASE
Inclusion in the annexure does not permit a task. The source excludes mine production and statutory technical duties unless independently authorised.
EVIDENCE AND CONTROLLING MINE AUTHORISATIONS
Keep actual water-level and upstream inflow logs, pump duty/standby tests, authorised isolation, pressure/valve acceptance, flood escape, confined sump rescue and receiving mine owner sign-off with the original editable Word record. Completion does not independently authorise critical mine pump operation, mine technical duties or a work-area release.
BUY A SINGLE ORIGINAL OR THE COMPLETE MINE FILE
This R12.95 source-identical AH-00 Word Single is already in the 371-document Underground Mining Checklist Package and complete 628-page Contractor H&S File. Existing owners should avoid buying it again. Mine-appointed water, engineering and emergency authorities remain responsible for safe dewatering-system release.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

