top of page

12 - AB-09-C01 | Underground Permit-to-Work, LOTO & High-Risk Check

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95

AB-09-C01 — UNDERGROUND PERMIT-TO-WORK, LOTO & HIGH-RISK CHECK

This original AB-09-C01 underground mining workface and technical evidence Word contains 10 true source safety points. The buyer receives the actual printable and editable document, not a generic remake.

WHERE THE SOURCE MINE RECORD APPLIES

Use before and during Underground Permit-to-Work, LOTO & High-Risk Check within the host mine's permitted area, work order, shift and risk controls. Enter the source's responsible worker and host mine technical owner and confirm the current mine COP/SOP and approved work scope.

TEN ORIGINAL MINE SAFETY RELEASE / VERIFICATION POINTS

1. Host owner issues signed permission for exact zone, equipment, persons and shift.

2. All applicable permits identified: electrical, hot work, pressure, confined entry, height, coring, lifting.

3. Mine electrical/engineering authority owns isolation for critical mine plant.

4. Mechanical, hydraulic, pneumatic, gravity, process, thermal and remote energy covered.

5. Lock/tag and test-for-zero process witnessed to mine standard.

6. Gas test, roof/ground, ventilation, rescue and equipment permissibility hold points recorded.

7. SIMOPS, blasting, traffic and production scheduling conflicts closed.

8. Shift suspension, handover, change and expired permits require reissue under host procedure.

9. Start/restart after abnormal condition requires positive mine release.

10. Final clearance and test/return-to-service permits approved by asset owner.

HOW TO COMPLETE THE PRINTED WORD RECORD

Mark the ten genuine RELEASE / VERIFICATION POINT rows YES, NO or N/A, document EVIDENCE / ACTION and cite the responsible mine official, valid technical permission and actual mine measurements.

MINE AUTHORISED STOP WORK AND RELEASE

The original requires stopping for critical failed controls, unresolved exposure, missing mine permit, unsafe atmospheric conditions, excluded work zone or incomplete safety evidence. Contractor signatures and completed boxes cannot by themselves approve mine work or restart/reoccupation.

INDIVIDUAL WORD OR COMPLETE MINE DOCUMENT COLLECTION

This R12.95 AB-09-C01 source Word also comes with the 371-original Underground Mining Checklist Package and the complete 628-page Contractor H&S File. Existing collection buyers should avoid duplicate purchases. Mine-specific induction, permission and technical authorisation still apply.

THREE CLICKABLE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining H&S File

    bottom of page