top of page

119 - AG-C02 | Hot Work Underground Shift & Area Readiness Checklist

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95

AG-C02 — HOT WORK UNDERGROUND SHIFT & AREA READINESS CHECKLIST

Seven original underground hot-work shift controls start with mine fire/gas/coal-dust permit clearance and end with WPS, weld IDs and NDT witness holds.

WHEN THIS ORIGINAL UNDERGROUND SOURCE IS USED

Use at every shift or changed-hazard review for underground fabrication, steelwork and cutting. Complete MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR.

SEVEN PRINTED UNDERGROUND FABRICATION SAFETY ITEMS

1. Hot work authorisation addresses coal dust, flammable gas and mine fire restrictions

2. Welding enclosure, ventilation and fume extraction suited to mine atmosphere

3. Ground/rock support and mine infrastructure protected from welding heat and sparks

4. Pressurised pipe, cable, conveyor and lubrication equipment screened for heat exposure

5. Fire watch, portable suppression and post-work monitoring agreed with mine fire owner

6. Consumables and gas cylinders accounted for on entry and return

7. Weld identification, procedure, welder approval and NDT holds documented

COMPLETING THE SOURCE WORD RECORD

For seven source WORKFACE VERIFICATION / REQUIRED CONTROL rows mark Y/N/N/A and record EVIDENCE / DEFECT / ACTION, referencing gas tests, fire watch, ventilation, cylinder issue/returns and cable/rock protection.

MINE FIRE SAFETY AND STOP-WORK RESTRICTIONS

A prior shift's clearance does not authorise ongoing ignition after gas, dust, equipment or scope changes. HOLD until the appointed mine fire authority accepts the current work area.

SOURCE EVIDENCE AND OPERATOR AUTHORITY

The original Word file is editable. Preserve actual mine fire permits, atmosphere test results, protected ventilation and services, weld inspection/NDT, gas-cylinder records, fire watch and the mine owner's written close-out. Contractor checks never authorise underground hot work or statutory mine engineering.

BUY A SINGLE OR THE COMPLETE MINE COLLECTION

This R12.95 AG-C02 Word Single is included already in the 371-original Underground Mining Checklist Package and the full 628-page Contractor H&S File. Owners of either complete collection should not purchase a duplicate. The appointed mine engineering and fire officials retain all ignition-work and area-release authority.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining Contractor H&S File

    bottom of page