top of page

118 - AG-C01 | Welding, Fabrication & Steel Ten-Point Pre-Start

R 12,95Price

Buy 4 Checklists, Get 1 Free

SURFACE MINING SINGLES OFFER — Select 5 individual documents for the price of 4; 10 for 8; or 15 for 12. This original AVC buyer-private editable Word Single costs R12.95.

WHY THIS MINE WORKFACE CONTROL MATTERS

A compliant steelwork pre-start must establish flammability, welder qualification and temporary stability before tools energise or lifting begins. This real ten-point checklist has separate contractor and mine host release.

ACTUAL SOURCE CONTROLS — PRINTED ORDER

1. Confirm hot-work permit and mine fire-impairment notification.

2. Verify competent welders, current drawings and approved WPS.

3. Assess gas, coal/combustible dust, fuels and flammable atmosphere.

4. Position fire watch, barriers and firefighting provision including post-work watch.

5. Restrain, segregate and move gas cylinders to mine rules.

6. Verify electrical welding sets and controlled return-current path.

7. Approve erection plan, lifting, temporary stability and drop zones.

8. Obtain extra permits for elevated, confined or operating plant settings.

9. Identify weld inspection/NDT and bolting torque criteria before work.

10. Accept final visual/structural and housekeeping clearance before handback.

REAL RECORD FIELDS AND EVIDENCE

This is the original AG AG-C01 ten-control Y/N/N/A prestart release checklist within Structural Steel, Fabrication, Welding & Hot Work. Ten genuine YES/NO/N/A RELEASE/VERIFICATION POINTS with EVIDENCE/ACTION, mine/site/zone, company, work order and supervisor, distinct contractor and host-mine signatures with date/reference.

STOP / HOLD / RELEASE AUTHORITY

Any failed critical control is referred to the mine official; mine-owned technical holds and fire restrictions must be released before affected work starts.

PRACTICAL MINE USE

Use before shop fabrication, active-plant grinding, weld repairs, erection, cutbacks and steel lifting. Fill in real current work-order identifiers, workface conditions, test records and supporting references on the editable DOCX. A document completed by a contractor is supporting evidence, never self-authorisation to remove a mine-owned hold.

SINGLE OR COMPLETE CONTRACTOR PACKAGE?

Buy this Single if you need specifically welding, fabrication & steel ten-point pre-start. The IDENTICAL original Word document is ALREADY INCLUDED in the complete 386-document Surface Mining Checklist Package AND in the full Surface Mining Contractor Health and Safety File. A buyer of either larger product should NOT buy the identical Single separately.

Browse all editable Safety Checklist Singles

Explore the complete 386-document Surface Mining Checklist Package

Explore the full Surface Mining Contractor H&S File

AVC's mine documents support site-supervisor evidence and safe decision boundaries. Continue to comply with the mine's own permit, competent engineering sign-off, fire-watch procedure and authorised area/structural release before allowing work to proceed.

    bottom of page