113 - AF-TT01 | Underground Machine Hydraulics & Stored Energy Talk
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95
AF-TT01 — UNDERGROUND MACHINE HYDRAULICS & STORED ENERGY TALK
Five true underground TMM stored-energy toolbox checks cover mine machine authority, planned safe recovery, no-roll parking, electrical/hydraulic/gravity isolation and mechanically held raised equipment.
MINE TMM WORK APPLICATION
Use before hydraulics, cylinder, accumulator, bucket, brake or mobile plant recovery work. Record Mine / area, Contractor, Date / shift, Presenter, Work order / task and Risk assessment ref.
FIVE ORIGINAL MOBILE PLANT SAFETY POINTS
1. Mine TMM owner confirms plant entry, work order, permissible machine classification and work zone.
2. Machine recovery/movement plan controls gradient, personnel, ventilation and mine traffic separation.
3. Machine parked on stable grade with chocking, brake, blocking and physical anti-movement controls.
4. Hydraulic, pneumatic, battery/electrical, gravity, spring and pressure hazards isolated.
5. Support raised machine parts with rated mechanical restraints and verify stored pressure has been safely discharged.
COMPLETING THE PRINTED WORD FIELDS
Brief five actual original points, confirm mine TMM owner permission, gradient and mine traffic controls, chocks and brake, lockout and release of hydraulic/spring/pressure energy, and rated support of raised parts. Record the original crew attendance.
TMM STOP-WORK AND FLEET AUTHORISATION
Unknown hydraulic energy, unsupported machine parts or unsafe grade requires STOP. The competent mine fleet owner retains restart and work-area release authority.
EVIDENCE AND MINE CONTROL RESPONSIBILITY
Keep the original work order, permitted TMM class, traffic controls, mechanical locks, support capacity, hydraulic isolation, ventilation, collision checks and mine-approved testing. This editable Word records contractor evidence but never authorises an unapproved machine movement or releases a mine technical asset.
BUY THE SINGLE OR COMPLETE UNDERGROUND COLLECTION
This R12.95 AF-TT01 Word original is included in the 371-original Underground Mining Checklist Package and 628-page Contractor H&S File. Owners of either complete collection should avoid buying again. The appointed mine TMM, engineering and traffic duty holders retain operational permission and safe return-to-service responsibility.
THREE LIVE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

