top of page

109 - AF-R02 | TMM Workshop Defects & Corrective Action Log

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95

AF-R02 — TMM WORKSHOP DEFECTS & CORRECTIVE ACTION LOG

Original five-column OPEN-ENTRY underground mobile plant, TMM and workshop defect/corrective-action log. It intentionally contains no seven prewritten pass/fail items; record actual machine faults, hazard control and mine fleet acceptance.

WHERE THIS MINE TMM ORIGINAL APPLIES

Use after inspections detect braking/proximity failures, hydraulic leaks, unstable raised parts, tyre/rim damage, unsafe recovery attachments or workshop ventilation problems. Fill Underground mine / site, Company, Contract / work order and Responsible person.

FIVE ORIGINAL OPEN-ENTRY REGISTER COLUMNS

ITEM / LOCATION

DEFECT / CONTROL

OWNER / TARGET

ACTION / EVIDENCE

ACCEPTED / CLOSED

COMPLETING THE SOURCE WORD EVIDENCE

Use five genuine source headings ITEM / LOCATION, DEFECT / CONTROL, OWNER / TARGET, ACTION / EVIDENCE and ACCEPTED / CLOSED. Identify machine and exact mine zone, immediate no-roll containment, action owner, target, pressure/functional test evidence and formal mine close-out.

MACHINE STOP-WORK AND MINE FLEET RELEASE

The source CONTROL clause demands updated entries after changed mine hazards, equipment, crew, authorisation or work scope. A defect cannot be marked closed merely because a contractor says repairs were performed; affected plant remains on HOLD.

EVIDENCE AND CONTROLLED MINE WORKPERMISSION

Retain actual trackless machine class, maintenance job card, rated lifting and recovery plan, blocking and LOTO, brake/proximity tests, competent tyre safety, workshop airflow and inspection proof. This authentic editable Word is an evidence form; it cannot permit mobile equipment travel, release a machine or override mine traffic control.

BUY ONE SOURCE SINGLE OR COMPLETE MINE COLLECTION

This R12.95 AF-R02 Word original is included in the 371-document Underground Mining Checklist Package and complete 628-page Contractor H&S File. If you own either collection, avoid a duplicate purchase. Operator-controlled mine TMM inspection, recovery, fire and fleet approval governs the work.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining H&S File

    bottom of page