top of page

107 - AF-H02 | TMM Witness Hold & Mine Return-to-Service Gate

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95

AF-H02 — TMM WITNESS HOLD & MINE RETURN-TO-SERVICE GATE

Five source-original operator-owned TMM return-to-service witness gates check mine-approved machine class, blocked movement and raised parts, proximity/brakes/steering proving, competent tyre work and mine workshop exhaust control.

WHERE THIS MINE TMM ORIGINAL APPLIES

Use at witnessed inspection, maintenance hold and controlled machine handback inside underground TMM work zones. Complete MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR.

FIVE GENUINE MINE TMM WITNESS HOLD GATES

1. TMM entry and machine class accepted under the mine traffic/COP system

2. Machine immobilised; articulation locks, raised bodies and stored energy secured

3. Proximity/collision prevention devices, brakes and steering included in test plan

4. Tyre/rim/wheel work performed to mine-approved exclusion and competent procedure

5. Workshop ventilation and diesel/exhaust exposures assessed for repair duration

COMPLETING THE SOURCE WORD EVIDENCE

Complete genuine HOLD TRIGGER / EVIDENCE GATE, REQUIRED EVIDENCE / VERIFICATION and RESULT / REFERENCE / WITNESS fields for all five printed holds. Attach machine classification, LOTO and articulation locks, proximity/brake test, certified tyre work and air monitoring.

MACHINE STOP-WORK AND MINE FLEET RELEASE

The original RELEASE CONDITION requires all applicable gates PASS with dated work-order proof and corrected defects independently witnessed. Only the named mine authority issues a plant/area release. No contractor implied restart.

EVIDENCE AND CONTROLLED MINE WORKPERMISSION

Retain actual trackless machine class, maintenance job card, rated lifting and recovery plan, blocking and LOTO, brake/proximity tests, competent tyre safety, workshop airflow and inspection proof. This authentic editable Word is an evidence form; it cannot permit mobile equipment travel, release a machine or override mine traffic control.

BUY ONE SOURCE SINGLE OR COMPLETE MINE COLLECTION

This R12.95 AF-H02 Word original is included in the 371-document Underground Mining Checklist Package and complete 628-page Contractor H&S File. If you own either collection, avoid a duplicate purchase. Operator-controlled mine TMM inspection, recovery, fire and fleet approval governs the work.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining H&S File

    bottom of page