103 - AF-C01 | TMM Ten-Point Task Readiness & Prestart Checklist
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95
AF-C01 — TMM TEN-POINT TASK READINESS & PRESTART CHECKLIST
TEN original mine TMM prestart items cover work zone, grade/recovery, chocks and brakes, locked energy, rated bucket supports, tyre/fuel hazards, permissibility, diesel exhaust, collision controls and approved test route.
ORIGINAL MINE TMM APPLICATION
Use before mine-authorised mobile plant workshop work. Fill mine/site, company, area, shift, task and supervisor.
TEN ORIGINAL TMM PRESTART CONTROLS
1. Mine TMM owner confirms plant entry, work order, permissible machine classification and work zone.
2. Machine recovery/movement plan controls gradient, personnel, ventilation and mine traffic separation.
3. Machine parked on stable grade with chocking, brake, blocking and physical anti-movement controls.
4. Hydraulic, pneumatic, battery/electrical, gravity, spring and pressure hazards isolated.
5. Booms/buckets/raised components mechanically restrained; no unsupported suspended equipment.
6. Fuel, battery, tyre, rim and accumulator hazards managed by competent procedures.
7. Hot work, tools and materials comply with mine gas/fire and permissibility restrictions.
8. Ventilation exhaust/diesel emissions and thermal load coordinated with mine ventilation control.
9. Braking, steering, proximity detection, lights, alarms, suppression and guards checked.
10. Controlled test route authorised, with mine supervisor and traffic exclusion, before handback.
PRINTED WORD RECORD AND EVIDENCE
Mark YES/NO/N/A with EVIDENCE / ACTION for ten printed RELEASE / VERIFICATION POINT rows; retain actual approval and test evidence.
STOP-WORK AND MINE FLEET RELEASE
Original RELEASE RULE demands operator-owned high-risk holds cleared and MINE / HOST RELEASE kept separate from CONTRACTOR CHECK.
MINE EQUIPMENT PERMITS AND TEST RECORDS
Keep true TMM model/class, mine traffic COP, actual locks and support, braking/proximity checks, competent tyre service, approved work order, testing route and operator acceptance. The original editable Word is evidence, not a permit to drive or release machinery.
SINGLE ORIGINAL OR COMPLETE UNDERGROUND FILE
This R12.95 AF-C01 Word source is also included in the 371-document Underground Mining Checklist Package and full 628-page Contractor H&S File. Existing owners should avoid a duplicate purchase. Mine traffic, TMM engineering and fleet duty holders retain release authority.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

