top of page

103 - AF-C01 | Mobile Plant Ten-Point Task Readiness & Pre-Start

R 12,95Price

Buy 4 Checklists, Get 1 Free

SURFACE MINING SINGLES OFFER — Buy five individual documents and pay for four; buy ten for eight; buy fifteen for twelve. This source-original AVC editable Word document costs R12.95.

WHY THIS MINE MOBILE PLANT CONTROL MATTERS

Before servicing mine earthmoving plant the supervisor must control road interfaces, unintended machine movement, multiple energy stores, tyre pressure and test-drive permissions. The source includes ten separate readiness controls and distinct host release.

THE ORIGINAL PRINTED CONTROLS — IN ORDER

1. Verify TMM machine identity and mine host inspection status.

2. Confirm mine road/movement authority and pedestrian segregation.

3. Park, isolate and chock machine to prevent movement.

4. Control hydraulic, pneumatic, electrical, gravity and mechanical stored energy.

5. Mechanically support raised booms and attachments; never jack-only support.

6. Apply specialist tyre/rim pressure and stored energy controls.

7. Control batteries, hazardous fluids, spills and fuel ignition sources.

8. Confirm lifting gear and support stand capacity.

9. Obtain mine host release of controlled test drive/proving ground.

10. Confirm guards, brakes, steering and critical safety devices for return to service.

PRINTED FIELDS AND TRUE EVIDENCE

This is source AF AF-C01, an actual ten-point Y/N/N/A repair prestart verification form from Mobile Plant, Earthmoving & Workshop Repair. Ten original RELEASE/VERIFICATION POINTS with YES/NO/N/A and EVIDENCE/ACTION; mine/site and work order fields, supervisor, company, date/shift, separate contractor and mine host release signatures/date/reference.

STOP / HOLD / MINE AUTHORITY

A failed critical check must go to the mine official; the form does not grant TMM operating permission or substitute for formal machinery test authority.

HOW TO USE THE EDITABLE WORD FILE

Use before shutdown service, replacement of hydraulic parts, workshop lifting, tyre work and fleet testing. Enter actual machine identities, work-order references, observed defects and calibrated test evidence. The editable private DOCX lets the contractor maintain the source records without changing the mine owner's critical permit, fleet or technical sign-off.

AVC SINGLES VS COMPLETE PACKAGES

Order this Single only if mobile plant ten-point task readiness & pre-start is the control needed. The IDENTICAL original Word document is ALREADY INCLUDED in the complete 386-document Surface Mining Checklist Package and in the full Surface Mining Contractor Health and Safety File. A customer who bought either parent product should NOT purchase this Single again.

Browse all editable Safety Checklist Singles

View complete 386-document Surface Mining Checklist Package

View full Surface Mining Contractor Health & Safety File

    bottom of page