top of page

102 - AG-C01 | Pumps & Rotating Machinery Workface Prestart Checklist

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Automatic offer on eligible individual checklists: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Browse individual checklists. Confirm the discount in your cart before checkout.

102 - AG-C01 | Pumps & Rotating Machinery Workface Prestart Checklist

WHERE / WHEN & WHY THIS DOCUMENT IS USED

Use this at the actual refinery workface immediately before the task starts, after site-specific instructions and permits have been identified. It checks the method, equipment, process interface and trade-specific controls against current plant conditions—not a generic site induction. Here the trade is pumps and rotating machinery, with a source-identified process exposure of stored pressure, rotating inertia, or seal-fluid leak during pump/compressor intervention. Link the checks to actual equipment tags and the current facility-authorised scope.

THE SOURCE-PRINTED CONTROLS

The document contains EIGHT printed PROCESS / SAFETY VERIFICATION rows, each with Y, N and N/A decision boxes: (1) Mechanical and process isolation approved for rotating equipment; (2) Suction/discharge contents and trapped energy assessed; (3) Lifting points, centre of gravity and guards controlled; (4) Oil/seal contamination and flushing route approved; (5) Machinery fitment/alignment tolerances and calibrated tools available; (6) Protection systems and lubrication condition inspected; (7) Run test boundaries, vibration and trip setpoints agreed; (8) Guarding and maintenance handback signed.

HOW TO COMPLETE THE RECORD

Enter FACILITY / UNIT / EQUIPMENT, the true work order and operator PTW reference, plus contractor/shift. Inspect actual conditions, record EVIDENCE / OPEN ACTION / PERMIT VARIATION, and explain any N/A. The form requires separate CONTRACTOR / NAME & SIGN and FACILITY / AUTHORITY & SIGN with DATE / TIME. Keep underlying inspection, SDS, test or permission evidence as relevant to these exact controls.

STOP, HOLD & AUTHORITY LIMITS

The original HOLD RULE is explicit: an unanswered critical item, absent plant permit or unapproved deviation requires STOP/HOLD. A contractor tick, internal signature or completed checklist does not authorise release from an operating refinery. Resolve deficiencies with the competent technical reviewer and facility operator, and record the approved decision before progressing.

TRY ONE, THE PACKAGE OR THE COMPLETE SAFETY FILE

Download this original editable A4 Word (DOCX) record individually for R12.95. The 260-document Petrochemical Checklist Package is R1,559.95 (approximately R6 per record). The complete 500-page Petrochemical Contractor Safety File currently costs R1,899.95—only R340 more than the package—and contains the same 260 forms plus A–AA contractor management, compulsory AB and all AC–AV specialist annexures. Read individual listings to understand a form before choosing a larger set. Prices may change; templates are not accredited or operator-issued permits.

Source code AG-C01 • Pumps and Rotating Machinery • Editable DOCX

    bottom of page