003 - AB-00B | Trade Annexure Activation & Print Control
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Automatic offer on eligible individual checklists: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Browse individual checklists. Confirm the discount in your cart before checkout.
003 - AB-00B | Trade Annexure Activation & Print Control
Why this trade selection record comes first
List only the trade groups performed by the contractor; avoid sending irrelevant sections. Use a trade section only after a real operator work order, site acceptance, permit and competent supervision are confirmed.
Exact original table and available specialist trades
The printed matrix has USE / SEC / WORK CATEGORY / WORK ORDER / N/A BASIS columns for the specialist sections. Its 20 trade categories are AC General Building, Masonry & Civil Refurbishment; AD Roofing, Waterproofing, Glazing & Building Envelope; AE Electrical Installations, Lv Power & Temporary Supplies; AF Instrumentation, Sis, Control & Automation; AG Rotating Machinery, Pumps, Compressors & Drives; AH Pressure Equipment, Vessels, Boilers & Heat Exchangers; AI Process Pipework, Flanges, Valves & Line Breaking; AJ Storage Tanks, Vessel Cleaning & Tank Farm Work; AK Industrial Cleaning, High-Pressure Jetting & Vacuum; AL Fire Detection, Suppression & Impairment Work; AM Hot Work, Fabrication, Welding & Structural Repair; AN Cranes, Rigging, Forklifts & Critical Loads; AO Scaffolding, Heights, Rope Access & Temporary Access; AP Hvac, Refrigeration, Ventilation & Air Handling; AQ Painting, Coatings, Insulation & Corrosion Control; AR Water, Wastewater, Drains & Effluent Systems; AS Tanker Loading, Bulk Transfer & Road Logistics; AT Laboratory, Sampling, Analysers & Chemical Services; AU Ndt, Inspection, Quality Assurance & Testing; AV Stores, Site Services, Waste & Digital Support.
How to decide what must be included
Mark each specialist AC–AV section USE or NOT APPLICABLE against the actual work order. Record the workpack reference or genuine N/A basis and name the responsible person reviewing which pages will be printed/issued. Keep the controlling A–AA and refinery AB requirements intact; do not delete mandatory operating-facility interface records.
Selection is not an operator work permit
The operator must independently accept the work order, contractor, boundaries and necessary permits. Ticking a specialist trade here does not authorise mobilisation, isolation, process-system access or return to service.
INDIVIDUAL DOCUMENT OR COMPLETE REFINERY SAFETY SYSTEM?
This individual source-identical editable A4 Word document is R12.95. The 260-document Petrochemical Checklist Package is R1,559.95; the 500-page Petrochemical Contractor Safety File is currently R1,899.95 and includes all 260 forms, A–AA, the compulsory AB process-plant interface and AC–AV specialist annexures. Read the single to understand what the particular record does, then choose the set that fits your scope. Prices may change.
Source: AB-00B • Petrochemical Section AB • Editable DOCX • trade activation / print selection

