003 - AB-00B | Nuclear Trade Activation Selection Register
Buy 4 Checklists, Get 1 Free
SOURCE-ORIGINAL NUCLEAR CONTRACT RECORD
AVC AB-00B original editable Word for nuclear trade activation selection register. This source helps a South African nuclear-facility contractor identify real work and acceptance controls rather than copying general construction assumptions. It never confers a nuclear licence, radiological permission, secure site access, permit to work or authority to operate safety-related plant.
WHEN TO COMPLETE AND ACTIVATE
Use the actual nuclear facility and unit, operating area, contractor, approved work order and current station instruction revision. Identify genuine scope limits, legal/contract SHE applicability, appointed competent persons, current facility rules, safety/quality classification and station-authorised technical owner. When plant status or scope changes, revisit the work pack before proceeding.
ACTUAL PRINTED WORD REQUIREMENTS
AB-00B TRADE ACTIVATION / PRINT SELECTION REGISTER • Tick only the applicable trade annexures and complete the operator-issued permission for each work package. • WORK PACK / LIMITS • CLEANING, HOUSEKEEPING & INDUSTRIAL SERVICES • BUILDING, TILING, CIVIL & REFURBISHMENT WORK • HVAC, REFRIGERATION & VENTILATION SERVICES • ELECTRICAL POWER & TEMPORARY SERVICES • INSTRUMENTATION, CONTROL & CALIBRATION • MECHANICAL & ROTATING EQUIPMENT MAINTENANCE • PIPING, VALVES, PUMPS & PRESSURE SYSTEMS • STRUCTURAL STEEL, WELDING
HOW TO USE THE SOURCE CORRECTLY
The printed selection matrix identifies elective nuclear specialist trade annexures AC–AR, along with the actual USE, DIVIDER, TRADE SECTION and WORK PACK / LIMITS fields. Tick only the trades awarded and accepted for this contract. Document operator-specified limitations and print only applicable annexures.
FACILITY OPERATOR CONTROLS AND QUALITY HOLDS
The facility licence holder independently controls plant configuration, secure access, radiological work, isolations, quality inspections and protected system release. Nuclear-specific permissions may apply even to ordinary contractor services, while occupational health and construction duties can also apply depending on actual activities. Keep controlled facility credentials, layouts and protected system instructions only in authorised station records.
EDITABLE ORIGINAL AND COMPLETE AVC NUCLEAR PACKAGES
This authentic editable Word Single costs R12.95. The same source is already included in the 228-document Nuclear Facility Outage Checklist Package and the complete 461-page Nuclear Contractor Health & Safety File. Avoid paying twice. Eligible Singles may qualify for BUY 4 GET 1 FREE under an active automatic cart offer; verify checkout. Complete packages are excluded.

